MS2
Wednesday, September 15, 2010
Training on the Medium Voltage Switchgear at Prkng Lt 4.
Cutler Hammer / Eaton Rep "Jun"
Link
to photos, manual and the
Power Point presentation
12KV Switch Gear Pkng Lt 4
Schedule Preventative Maintenance
B
atteries check hygrometer monthly
Start
Log Keeping
process
Schedule period of inspections of erosion indicators.
Missing parts include
racking handle
charging handle
extension rails
We need a hard copy of the manual to leave in battery compartment
menu guide for fault indicators on site
Correction needed
Create as built Hi Voltage Single Line Diagram
Correct Bunker exposed Hi Voltage connections
amp meter calibrated for 1200 amps when we use less than 30 amp
Wednesday, February 3, 2010
swim pool gfi lights
ot report
lots of problems with the swim pool lites
see diagram
now bob called back at 1823 with report that also there are lights in the dive pool that don't work.
Newer Posts
Home
Subscribe to:
Posts (Atom)