Wednesday, September 15, 2010

Training on the Medium Voltage Switchgear at Prkng Lt 4.



















Cutler Hammer / Eaton Rep "Jun"







Link to photos, manual and the Power Point presentation



12KV Switch Gear Pkng Lt 4

    • Schedule Preventative Maintenance
      • Batteries check hygrometer monthly
        Start Log Keeping process
        Schedule period of inspections of erosion indicators.


          • Missing parts include
            • racking handle
              • charging handle
                • extension rails
                  • We need a hard copy of the manual to leave in battery compartment
                    • menu guide for fault indicators on site
                  • Correction needed
                    • Create as built Hi Voltage Single Line Diagram

                      Correct Bunker exposed Hi Voltage connections
                      amp meter calibrated for 1200 amps when we use less than 30 amp


                Wednesday, February 3, 2010

                swim pool gfi lights


                ot report
                lots of problems with the swim pool lites
                see diagram
                now bob called back at 1823 with report that also there are lights in the dive pool that don't work.