Wednesday, September 15, 2010

Training on the Medium Voltage Switchgear at Prkng Lt 4.



















Cutler Hammer / Eaton Rep "Jun"







Link to photos, manual and the Power Point presentation



12KV Switch Gear Pkng Lt 4

    • Schedule Preventative Maintenance
      • Batteries check hygrometer monthly
        Start Log Keeping process
        Schedule period of inspections of erosion indicators.


          • Missing parts include
            • racking handle
              • charging handle
                • extension rails
                  • We need a hard copy of the manual to leave in battery compartment
                    • menu guide for fault indicators on site
                  • Correction needed
                    • Create as built Hi Voltage Single Line Diagram

                      Correct Bunker exposed Hi Voltage connections
                      amp meter calibrated for 1200 amps when we use less than 30 amp