Establish preventative maintenance schedule
Monday, September 26, 2011
Wednesday, September 21, 2011
Monday, February 14, 2011
Megger the Baseball panel bringing the main PE 800A breaker down
No resistance at 500v
Just because the panel, the pipe and the wire have been there thirty years for the insulation to be compromised, but there you are!
Trips set at minimum but the main trips first anyway
Looks kind of wet.
XHHW-2 is a much better insulation than THHW for wet locations. I have seen several failures of THHW in underground conduits, which around here, are water filled. Plus XHHW-2 is 90 C rated for wet locations and THHN in a wet location is not.
Tuesday, November 2, 2010
Lucky stars
A laborer with the pipeline company was digging with an iron bar up behind Woodlands .

He struck an unmarked High Voltage line [15,000V]
.
He was lucky to be uninjured but we had a big power disruption.

While we were restoring power, we found that we had no key for the new photovoltaic enclosures at PE. Bob had to pick the lock on the enclosure.
I didn't take any pictures but we found the pool pump house was all quiet. There are no phase loss monitors in any of the new buildings, but the four of the control voltage circuit breakers tripped resulting in complete shutdown of big motors. Don't know if this was designed in by EE or just lucky.
Also one of the three PV cabinets had a faulted 125A CB that shut down that one enclosure.
Recommend District consult with EE if Phase Loss Monitors required before next Hi Voltage event/
Wednesday, October 6, 2010
Wednesday, September 15, 2010
Training on the Medium Voltage Switchgear at Prkng Lt 4.
Cutler Hammer / Eaton Rep "Jun"
12KV Switch Gear Pkng Lt 4
- Schedule Preventative Maintenance
Batteries check hygrometer monthly
Start Log Keeping process
Schedule period of inspections of erosion indicators.
- Missing parts include
racking handle
charging handle
extension rails
- We need a hard copy of the manual to leave in battery compartment
menu guide for fault indicators on site
- Correction needed
Create as built Hi Voltage Single Line Diagram
Correct Bunker exposed Hi Voltage connections
amp meter calibrated for 1200 amps when we use less than 30 amp