Monday, November 28, 2011

Sc137 kitchen ct 15 overload

If this happens again, which it will, we will need to provide new
kitchen counter power.
:paulfanta

Friday, November 4, 2011

The blue illusions

Power requirements in front of SS

Pa primex now energized

Pa primex

Actually that old outlet is disabled. It goes down the spiral stairs
and is Unplugged down there

Pa primex unplugged

Pv1 power job complete

Pv1 power

There is no power outage. The Herman miller partitions are not
enabled. I will rearrange the power strip

Thursday, November 3, 2011

RE: Lot 2 parking lights


The timer just needed programming.  I updated that and put in a new battery.

Lot 2 parking lights

The timer just needed programming.  I updated that and put in a new battery.

<

Wednesday, October 26, 2011

OH106 lighting fixture lenses

Fixtures are secured.
Some ballasts remain out.

Lots 6&7 and creek to college

There are 2 tall poles that are cycling.
We will need to rent a lift this Christmas break
Also sc entrance, one Creekside by frank Crosby
One at the bridge
Also if we keep the light on at June lee health center that will
brighten the path

Spanish steps

One light out

Lot 2 needs local programming and maintenance

Local timer batteries corroded. Programming off.

FH FA path

Lights look good

Friday, October 21, 2011

FH lights on

FH lights on

Hc streetlight by tent

The one by FH needs new ballast

Cafeteria exit lighting

That switch is by the coke machine/elevator room.

Testing lab outlets secured

All the Testing lab outlets appear to be secured now. I visually
inspected each of 9 compartments.

Monday, October 17, 2011

Wednesday, October 12, 2011

Acid pump