Wednesday, October 26, 2011

OH106 lighting fixture lenses

Fixtures are secured.
Some ballasts remain out.

Lots 6&7 and creek to college

There are 2 tall poles that are cycling.
We will need to rent a lift this Christmas break
Also sc entrance, one Creekside by frank Crosby
One at the bridge
Also if we keep the light on at June lee health center that will
brighten the path

Spanish steps

One light out

Lot 2 needs local programming and maintenance

Local timer batteries corroded. Programming off.

FH FA path

Lights look good

Friday, October 21, 2011

FH lights on

FH lights on

Hc streetlight by tent

The one by FH needs new ballast

Cafeteria exit lighting

That switch is by the coke machine/elevator room.

Testing lab outlets secured

All the Testing lab outlets appear to be secured now. I visually
inspected each of 9 compartments.

Monday, October 17, 2011

Wednesday, October 12, 2011

Acid pump

Thursday, October 6, 2011

Wednesday, October 5, 2011

SC166

Calendar reminder for 6OCT13 set.

Monday, October 3, 2011

PE new callback for exterior lights



From Evernote:

PE new callback for exterior lights

 These lights don't come from LCP-E, the old panel, rather from main electrical room by the photovoltaics. They all key just fine by hand, so i suspect it is a scheduling or photocell problem Cts 8&10 key the parking lots just fine with 17+18 amps of flow. That is a problem, similar to the one we have in the gym - and the fault of circuit specifier/mapper. Continuous duty cts (more than three hours on) can only be rated for 80% of cb ampacity. In this case 80% of 20a is 16a. Out of range. 

Bit that is not the issue. 
If parking lot lites were out, they key fine by hand, so now I have to find the schedule or photocell.