Friday, August 31, 2012

Elevator FA lamps

Ceramics kiln

The new kiln was installed with the underside outlet and cord cap

The whip size is correct that's 6/2 AWG w grnd

Oh no! It's an 80a breaker =0
Funny the other one is 31 amps and it's installed with a 50 amp cord

So we need a two pole 60 for the breaker for the breaker that burned up

The three pole 40 for the 31.7
4 wire ct that has the wrong size cb

Thursday, August 30, 2012

Lost wire

When this area got graded the feed to the pole by the cafeteria loading dock got interrupted.
The temp source was a bare wire in the earth. The source was the pole up high that was demolished.

This will take time and resources to correct.

Smcp

Wednesday, August 29, 2012

Delta

Tuesday, August 28, 2012

enclosure at PV

Don should we do something about this
Unsightly Trash enclosure at PV

Friday, August 24, 2012

A new hose for Haile

Heavy metal poisoning

Broken mercury lamps happen more often than I would like. I should get tested!

Thursday, August 23, 2012

Wednesday, August 22, 2012

Pv ext Lites

Tuesday, August 21, 2012

Tuesday, August 14, 2012

FH marin foundation

The 12 foot ladder for the custodial closet we need to buy one.

there were no lamps in the utility room
in rm 121 that I was supposed to pick up.

the Marin County College foundation the doors are locked the special key which I do not have. Have to to revisit that tomorrow

LRC 29 finish

LRC GROUP RELAMP

LRC GROUP RELAMP

Monday, August 13, 2012

Long enough

Double header at top of the quad

Birds nest Frank Crosby

The 10' letter is just not long enough we need a 12 foot ladder

LRC atrium lights po request

We will need another 20 of these to make the atrium come to life

maybe now is the time to do it at the beginning of fiscal year

How does that work again?

Thursday, August 9, 2012

LRC film studio birds nest

High ladder