Wednesday, October 3, 2012

Articulating staircase

First things first

Tuesday, October 2, 2012

Thursday, September 27, 2012

Calendar LRC

Canted street

We don't have any replacement at shop or football field

Simplex trouble call

I can go set the right time it's really 0830.
The master unit is down in the main electrical room by the Ceramics courtyard

Thursday, September 20, 2012

Child care

Wednesday, September 19, 2012

Circle dr

Monday, September 10, 2012

Fussellman hall way

Requires three lamp ballast which we don't stock and we don't have to Lamfalussy there so I modify the fixture wiring to utilize it for laptop

T12 log LRC up BA

Contains PCBs
That's the very last of the two lamp ballasts, I've been using four lamp ballast

we don't have anymore of the smaller ones.
I'm going to order up some two lamp ballast now

Friday, September 7, 2012

Studio theatre T12 changeout

Still needed

Birds nest

Thursday, September 6, 2012

LRC102

Elevator permit

Current elevator permit is on file at college corporation yard

Kiln

Friday, August 31, 2012